I'm a

July Test Project

This is a test project plan.

Duration

Nov 2026 - Dec 2027

Location

Mt Roskill

Status

Project overview

The proposal

This project forms part of our broader Western Isthmus Water Quality Improvement Programme (WIWQIP) of works which is a joint initiative between us and Auckland Council. It's aimed at reducing wastewater overflows and improving stream and beach water quality across the city’s central western isthmus.

The project involves the construction of a new wastewater pipeline from Canada Street in Auckland Central to the Central Interceptor at Western Springs Stadium.

The proposed pipeline will improve the collection and conveyance of wastewater to minimise the occurrence of spills and uncontrolled overflows that currently occur in the area. This project will also provide capacity for the future growth predicted in the catchment.

Timeline and map

Construction is estimated to take place between 2028-2031 across the works area displayed on the map below.

Diagram showing the project timeline, from July 2023 to August 2031.Map showing the route of work for the Motions catchment improvements.

Updated:

New content:

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Cras vulputate tempor lacus, sit amet imperdiet tellus rutrum non. Cras vulputate dictum facilisis. Sed efficitur placerat leo sit amet volutpat. Phasellus vitae dui lorem. Praesent ullamcorper felis quis enim pharetra aliquam. Proin sollicitudin libero vitae maximus consequat. Praesent at tempus ex.

Nullam commodo ante id magna tempus ornare. Vestibulum non odio nulla. Sed gravida nunc lacus, eget dignissim nisi eleifend ac. Aliquam quis pharetra libero. Nullam lobortis aliquam est nec molestie. Pellentesque facilisis placerat libero sit amet placerat. Quisque sed justo sodales, tristique dolor et, volutpat velit. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Class aptent taciti sociosqu ad litora torquent per conubia nostra, per inceptos himenaeos.

Suspendisse lobortis magna ut sem varius volutpat. Curabitur rutrum iaculis lacinia. Morbi id nulla nec leo laoreet dapibus. Nam vitae imperdiet leo. Vivamus cursus vehicula ultricies. Aenean in lobortis erat, ac sollicitudin lacus. Ut lorem ligula, interdum faucibus ex eu, euismod mollis velit.


Gallery

The modifications:

  • Title updated from 'July Test Project Modified' to 'July Test Project'
  • Updated rich text editor 1 - removed heading text "Modified" and "-modified content-" texts
  • Added an item to the media gallery
  • Added new rich text section