April Project Test
This is a test project plan.
Duration
2026 Apr
Location
Auckland CBD
Status
Project overview
The proposal
This project forms part of our broader Western Isthmus Water Quality Improvement Programme (WIWQIP) of works which is a joint initiative between us and Auckland Council. It's aimed at reducing wastewater overflows and improving stream and beach water quality across the city’s central western isthmus.
The project involves the construction of a new wastewater pipeline from Canada Street in Auckland Central to the Central Interceptor at Western Springs Stadium.
The proposed pipeline will improve the collection and conveyance of wastewater to minimise the occurrence of spills and uncontrolled overflows that currently occur in the area. This project will also provide capacity for the future growth predicted in the catchment.
-modified content-
Timeline and map
Construction is estimated to take place between 2028-2031 across the works area displayed on the map below.



Gallery
This is a test desc
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.