I'm a

Ōpōtiki - New Project Test DW

This is a test project

Duration

2026 Apr

Location

Auckland Central

Status

Project overview - Modified

The proposal

This project forms part of our broader Western Isthmus Water Quality Improvement Programme (WIWQIP) of works which is a joint initiative between us and Auckland Council. It's aimed at reducing wastewater overflows and improving stream and beach water quality across the city’s central western isthmus.

The project involves the construction of a new wastewater pipeline from Canada Street in Auckland Central to the Central Interceptor at Western Springs Stadium.

The proposed pipeline will improve the collection and conveyance of wastewater to minimise the occurrence of spills and uncontrolled overflows that currently occur in the area. This project will also provide capacity for the future growth predicted in the catchment.


Timeline and map

Construction is estimated to take place between 2028-2031 across the works area displayed on the map below.

Diagram showing the project timeline, from July 2023 to August 2031.Map showing the route of work for the Motions catchment improvements.

Test Media Gallery for Project

This is a media gallery for a project

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Pellentesque ut tristique diam. Vivamus pretium quam ut mi consequat euismod ac in justo. Cras non dolor eros. In quis turpis non elit sagittis vehicula et in neque. Suspendisse venenatis convallis orci, quis hendrerit nulla. Praesent feugiat, est in mollis sodales, ipsum felis viverra mi, nec viverra velit mauris et libero. Quisque nunc turpis, sollicitudin id lectus facilisis, vehicula consequat neque. Etiam justo purus, vehicula ac massa at, bibendum fermentum magna. Nunc ante erat, facilisis vel ipsum a, posuere finibus dolor.